Completed Lock Gates

< Next Wednesbury Oak Loop Next >
< Deepfields Junction Bradley Workshops >
Completed gates, waiting for transport to site
Completed gates, waiting for transport to site

Bradley Workshops make lock gates for use throughout the canal system.  There are several stacked outside awaiting collection, mostly by road but sometimes by boat.

Waterway and Kilometerage BCN-WOL 19.160
OS Grid Reference SO 95630 95093
Date and Time 110425 095553
Copyright © Paul Balmer

Leave a Reply

Your email address will not be published. Required fields are marked *

*