| < Next | Boardman’s Bridge Branch | Next > | |||
| < Ravenhead Branch Jn | New Double Locks Jn > | ||||
With canal restoration seriously proposed it’s a little surprising that a recently installed footbridge has been constructed with such limited clearance, especially as there aren’t any obvious reasons why it couldn’t have been constructed with navigation clearances.
| Waterway and Kilometerage | HELENS-BBB 24.580.01 |
| OS Grid Reference | SJ 51412 94933 |
| Date and Time | 160114 132601 |
| Copyright © | Paul Balmer |


Recent Comments