Over the Top of Aylestone Tunnel

< Next H&G Canal Next >
< End of Navigation Entry to Hereford >
Over the Top of Aylestone Tunnel

Over the Top of Aylestone Tunnel

The path follows above the first half of Aylestone Tunnel, then we must take to separate footpaths and roads which merely follow the general route, with much of the original alignment being lost under buildings and a new alignment being proposed for restoration.

Waterway and Kilometerage HAG 52.740
OS Grid Reference SO 51508 41685
Date and Time 160122 142701
Copyright © Paul Balmer

Leave a Reply

Your email address will not be published. Required fields are marked *